Transformers
Transformer Handling Throughout the Entire Lifecycle.
Transformers are the heart of the power grid infrastructure. Whether for new construction, replacement, or decommissioning: Every movement of a transformer requires precise planning, the right equipment, and the highest level of safety.
SEELAND handles the entire transformer handling process, both nationally and internationally. We move transformers in and out using cranes, lifting frames, or shunting, and we transport, store, and dismantle them professionally on-site. We carry out the installation in collaboration with selected partners. For manufacturers, suppliers, grid operators, transmission system operators, or partners.
Where we are in action for you
Installation & Removal
By crane, jacking frame, or skidding: We position transformers precisely on foundations…
read moreHeavy Transport
Special and heavy transports nationally and internationally, by road, rail, and waterway…
read moreIntermediate Storage
Is the construction site not ready yet? We store your transformer safely in our halls or…
read moreInstallation
Together with selected partners, we also take care of installation. One point of contact, clear…
read moreDismantling & Recycling
Oil draining, professional dismantling on-site or at dismantling areas and recycling with and without…
read moreSafety & Concepts
Project-specific risk assessments, disposal concepts with suitable material flow management and…
read moreOur Services for Your Project
- Installation and removal by crane, jacking frame, or skidding (Jack & Slide)
- Positioning on foundations, bunds, or rail systems, even with restricted headroom
- Special and heavy transports nationally and internationally, including route inspection and permits
- Intermediate storage in halls and open areas in the ports of Hamburg, Lübeck, and beyond
- Installation with selected partners
- Oil draining and professional dismantling on-site or at dismantling areas
- Disposal and recycling with and without PCB, including documentation in accordance with eANV
- Preparation of project-specific disposal concepts
- Evaluation of suitable material flow management
- Preparation of waste balances for submission to supervisory authorities
- Project-specific risk assessments
- Execution in accordance with SCCp standards
- Assessment of alternatives to disposal, e.g., purchase or reuse
Disposal that is planned right from the start
Before a transformer is dismantled, the plan is in place. We create a project-specific disposal concept: we record all materials and operating fluids, clarify the PCB status, and determine what will be recycled, reused, or disposed of.
In doing so, we evaluate the appropriate material flow management: which material takes which route, to which certified recycler, and with what documentation? This way, we return as many recyclable materials as possible to the cycle and comply with all regulations. In Germany as well as in international projects.
Upon completion, you receive a waste balance for submission to supervisory authorities, including recycling and disposal certificates.
Lifecycle at a Glance
Whether new build, replacement, or dismantling: we accompany your transformer across its entire lifecycle. In Germany, Europe, and worldwide. Exactly as much or as little as you need.
Planning & Safety
Advance PlanningFeasibility study, RAMS, and permits.
Transport
National & InternationalNationally and internationally from the factory, port, or site, by road, rail, and waterway.
Storage
Intermediate StorageIntermediate storage in Hamburg and Lübeck until the installation window.
Installation
Onto the FoundationSetting onto the foundation by crane, jacking frame, or skidding.
Installation
Partner NetworkInstallation with selected partners.
Removal
Dismantling of Old UnitsRemoval of the old transformer, oil draining, and onward transport.
Dismantling & Recycling
Disposal & RecyclingDisposal concept, material flow management, professional dismantling, and waste balance.



100t Transformers for Energiepark Hafen (HEnW)
During the new construction of Energiepark Hafen, we overcame an obstructing pipe bridge and delivered both 100t transformers on schedule.