Industrial & Petrochemical

 

Turnarounds on schedule. Incidents quickly brought under control.

In refineries, LNG plants, chemical complexes, and steel mills, every hour of downtime costs money. Large components must be on site, hoisted into place, and assembled right on time for the turnaround window—often while operations are ongoing and in extremely confined spaces.

SSEELAND plans and executes the transport, hoisting, and installation of columns, reactors, heat exchangers, and heavy machinery. We deliver on schedule for planned turnarounds and on short notice when a rapid response is needed during an incident.

Plant Logistics for Refineries, LNG & Steel | SEELAND
Operating LocationsRefineries, LNG terminals, chemical parks, cement plants, steel and aluminium mills
ComponentsColumns, reactors, heat exchangers, generators, rolls, presses
EquipmentHydraulic jacking systems, heavy-duty rollers, skidding tracks, mobile cranes, SPMT, barges, low-bed trailers

Where We Work for You

Your Advantage

Turnarounds and shutdowns on schedule. And rapid response in the event of a breakdown.

Our Services for Your Project

  • Industrial rigging and machinery relocation using jacking systems, rollers, and skidding tracks
  • Heavy haulage including design and fabrication of transport cradles
  • Crane provision including structural, ground, and foundation load calculations
  • RAMS and 3D CAD visualizations
  • ADR / IMO dangerous goods handling
  • Weather-protected interim storage with indoor overhead cranes
  • Personnel training: SCC, riggers/banksmen, forklift, telehandler operators, and more
End-to-End Supply Chain

One Chain. One Point of Contact.

From the manufacturer via sea route, port, storage, and transport to installation: We accompany your project across the entire supply chain. Exactly as much or as little as you need.

Case Study

Generator Repair

INTERCONTINENTAL AIR FREIGHT TRANSPORT
  • Route: Malaysia – Germany – Interim storage – On-carriage by road
  • Cargo: Generator rotor, 103 t incl. transport cradle
  • Transport modes: Air freight (Antonov heavy-cargo freighter), heavy haulage

A 103-tonne generator rotor had to be transported from Malaysia to Germany for repair. Instead of a multi-week sea passage, the air freight route was chosen: Following the arrival of the Antonov heavy-cargo freighter, we handled interim storage in Germany and on-carriage via heavy haulage directly to the workshop.

Case Study

Turbine Assembly

INSTALLATION OF A TURBINE SET IN NORWAY
  • Route: Hamburg, Germany – Alvik, Norway
  • Cargo: Turbine set, approx. 100 t incl. base frame
  • Transport modes: Ocean freight, heavy haulage

A turbine set weighing over 100 tonnes was transported from the former manufacturing plant in Hamburg for installation in Alvik, Norway. Transshipment via floating crane and rigging using two in-house hydraulic jacking systems—an all-around successful project.

Current Clients and Partners

PLANNING A TURNAROUND?

Tell us about your task. We will get back to you with a proposed solution—whether for the complete supply chain or individual stages.

Inquire now →

Your Contact for Industrial & Plant Projects

Sales
NameMario MaaßMessageTurnaround in planning or breakdown at the plant? Get in touch with us. We find a way even for unusual tasks.Phone+49 151 42229602Emailmario.maass@seeland.eu